Well today is the begin of the work on Desa Impiana.... so far the air cond guy have laid all the piping.... everything looks fine except for the piping job done at the living hall.. some mistake that the worker did.. so have to get them redo it and laid down nicely and neatly......
apart from that.... i get to be a kid again... you know when we are small we use to take a pen or pencil and draw on the wall.. well this time I get to do it without people scolding and with the owner of the house is watching.. hehehe....
actually i was drawing up the wiring layout on the wall so that the worker can follow without while I am not around. :)
On monday, 29 Mac, they will start unloading all the materials required into the condo... and that will take about 2 days..... ermmm on Wednesday the grill should be ready to be installed.
And the wiring job and the table top will start after that.. tentatively all this will be complete in 15 days.. then i have to get the carpenter to ready for the kitchen cabinet :)
No photo taken as I was busy discussing with the contractor.. forgot about it
Is exciting!