Job done 2 toilet cabinet, 1 tv cabinet and 1 wardrobe
Showing posts with label Renovation. Show all posts
Showing posts with label Renovation. Show all posts
Desa Impiana - Day 21
Iron Grill is up. Look perfectly fit...
Kitchen table top is 50% complete. More progress will carry on. My partner will work tomorrow as well as subsequent work doesn't involve knocking so can be done on weekend..
Painting should be starting tomorrow as well or tonight. I think they are working tonight as well.
Overall progress I would say 70%
Desa Impiana - Day 6
Sorry again as forgot to take picture. I wanted to, while driving I remind myself to take pic but then when I reach I forgot.. maybe is because of the rain.. I was soaking wet even with the damn umbrella..
Well summary
All plaster ceiling frame is up correctly....
Most of the plaster ceiling board is up still some is not as there are still some wiring need to do before cover it up.
Wiring part is mostly done. I would say another few days thing should look pretty.
sink, tap, hood, hob is settle
lighting is 99% settle
what is left, painting, iron grill, table top, kitchen cabinet, installation of sink and hob, installation of lights and stuff.
Well summary
All plaster ceiling frame is up correctly....
Most of the plaster ceiling board is up still some is not as there are still some wiring need to do before cover it up.
Wiring part is mostly done. I would say another few days thing should look pretty.
sink, tap, hood, hob is settle
lighting is 99% settle
what is left, painting, iron grill, table top, kitchen cabinet, installation of sink and hob, installation of lights and stuff.
Desa Impiana - Day 1
Well today is the begin of the work on Desa Impiana.... so far the air cond guy have laid all the piping.... everything looks fine except for the piping job done at the living hall.. some mistake that the worker did.. so have to get them redo it and laid down nicely and neatly......
apart from that.... i get to be a kid again... you know when we are small we use to take a pen or pencil and draw on the wall.. well this time I get to do it without people scolding and with the owner of the house is watching.. hehehe....
actually i was drawing up the wiring layout on the wall so that the worker can follow without while I am not around. :)
On monday, 29 Mac, they will start unloading all the materials required into the condo... and that will take about 2 days..... ermmm on Wednesday the grill should be ready to be installed.
And the wiring job and the table top will start after that.. tentatively all this will be complete in 15 days.. then i have to get the carpenter to ready for the kitchen cabinet :)
No photo taken as I was busy discussing with the contractor.. forgot about it
Is exciting!
apart from that.... i get to be a kid again... you know when we are small we use to take a pen or pencil and draw on the wall.. well this time I get to do it without people scolding and with the owner of the house is watching.. hehehe....
actually i was drawing up the wiring layout on the wall so that the worker can follow without while I am not around. :)
On monday, 29 Mac, they will start unloading all the materials required into the condo... and that will take about 2 days..... ermmm on Wednesday the grill should be ready to be installed.
And the wiring job and the table top will start after that.. tentatively all this will be complete in 15 days.. then i have to get the carpenter to ready for the kitchen cabinet :)
No photo taken as I was busy discussing with the contractor.. forgot about it
Is exciting!
Subscribe to:
Posts (Atom)